One bridge, before and after
Tuesday. Concrete on the towpath.
A walker reports a piece fallen from Bridge 9. Owen gets the call.
From: towpath user
“A lump of concrete the size of a fist, right under the arch. Could have hit someone.”
Bridge 9 · Mill Lane
Inspection programme
- Bridges: 60
- Inspectors: 1
- Photos on file: 18,400
The warning was in last visit’s photos.
Nobody could set them beside the visit before.
- not compared
Two visits, two folders, no way to compare them.
Now every photo is compared with the last.
Owen sees only what has changed on each bridge.
- damp 0.61
- spalling 0.88
- rebar 0.74
3 changes since the last visit sent to Owen.
Patched before anything fell.
Found on the photos, not on the towpath.
An illustrative bridge, based on our applied AI work.
- BR-09Spalling under the archRepaired
- BR-17Damp at the abutmentWatching
- BR-31No change since last visitDone
- AllCompared with the last visit60 of 60
From: towpath user
“A lump of concrete the size of a fist, right under the arch. Could have hit someone.”
Bridge 9 · Mill Lane
Inspection programme
- Bridges: 60
- Inspectors: 1
- Photos on file: 18,400
- not compared
Two visits, two folders, no way to compare them.
- damp 0.61
- spalling 0.88
- rebar 0.74
3 changes since the last visit sent to Owen.
- BR-09Spalling under the archRepaired
- BR-17Damp at the abutmentWatching
- BR-31No change since last visitDone
- AllCompared with the last visit60 of 60